
Elevators
LUXEN
High-speed comfort at mid-range speeds.
- Speed
- 1–3 m/s
- Load
- 450–2,000 kg
- Persons
- 6–26

00ProductsHyundai Elevator
Three platforms, from small residential buildings up to 45 storeys, chosen by height, traffic and available space.
01The range
Scroll: each caption changes the picture.

High-speed comfort at mid-range speeds.

The elevator that frees up the roof.

Belts replace ropes. Silence moves in.
02Line-up
Belts replace ropes. Silence moves in.
The elevator that frees up the roof.
High-speed comfort at mid-range speeds.
| Model | Storeys | Speed | Machine room |
|---|---|---|---|
| N:EX | Up to 25 storeys | 1–1.75 m/s | MR/MRL |
| YZER | Up to 45 storeys | 1–2.5 m/s | MRL |
| LUXEN | Up to 45 storeys | 1–3 m/s | MR |
03The models

Elevators
High-speed comfort at mid-range speeds.

Elevators
The elevator that frees up the roof.

Elevators
Belts replace ropes. Silence moves in.
according to Hyundai Elevator
04Where it fits
For apartment buildings and new developments: quiet, efficient, compact elevators, chosen by height, available hoistway and the programme’s budget.
Explore the sector · Residential & developmentIn a hotel, the elevator is part of the welcome: ride comfort, a refined car and constant availability, from lobby to guest floors.
Explore the sector · Hospitality & tourismDense flows at peak hours: destination selection, group control and card access for short journeys and a well-run building.
Explore the sector · Offices & headquartersClinics and hospitals need spacious cars and stronger hygiene: touchless buttons and antiviral handrails.
Explore the sector · HealthcareStations, airports and public buildings: equipment designed for large passenger volumes and intensive operation.
Explore the sector · Public facilities & transport05Planning
The points to settle with the architect and the engineers before pricing.
Hoistway size, pit depth and headroom depend on the chosen model, load and speed. We set them together at the outline design stage.
With a machine room (MR) or without (MRL): the choice frees a rooftop room or not. It is made with the architect, at the site-plan stage.
The number of cars, their capacity and speed follow from the occupants and uses of each floor. A traffic study confirms it.
06Quote